Neocloud operators have come under the spotlight. Between the closes of 13 and 16 October, CoreWeave lost 21% of its market value, Nebius 20% and IREN 22%. CoreWeave’s five-year credit default swap, about 547 basis points at the end of June (Dow Jones Market Data, reported by MarketWatch), reached a record intraday 1,194.5bp on 15 October (ICE Data Services, reported by Bloomberg), pricing more than a 60% chance of default within five years (our calculation, 40% recovery; see Appendix A). Bloomberg tied the move to CoreWeave’s talk of raising capital from insurers. A week earlier Firmus, an Australian operator with OpenAI as a customer, withdrew its share-market listing. All four rent out Nvidia GPUs. This prompts three questions: what these companies are, how they make and borrow money, and what their filings say about the default odds the market is pricing.
1. What they are
A neocloud rents GPU compute to AI labs and large technology companies, mostly under multi-year contracts. AWS, Azure and Google Cloud sell storage, databases and software alongside compute; a neocloud sells little besides the GPUs.
Three routes into the business:
Former crypto miners. CoreWeave was formed in 2017 as The Atlantic Crypto Corporation and mined mainly Ethereum until September 2022. It is now the largest of the four: $2,575M of revenue in the June quarter. IREN is a bitcoin miner turning its power sites into AI data halls. In the June quarter AI cloud brought in $70.5M and bitcoin mining $66.7M.
Tech-group spinout. Nebius Group, formerly Yandex N.V., listed on Nasdaq.
Newcomers. Firmus, Australian and private. Sites operating in Melbourne and Singapore; OpenAI anchors two sites under development in Malaysia.
Next to them sit the hosts, which lease powered buildings to neoclouds and do not own the GPUs. Core Scientific earned 77% of its first-half 2026 revenue from CoreWeave. Cipher Digital (formerly Cipher Mining) has a 15-year, 300MW lease with AWS and a 10-year lease with Fluidstack that Google backstops. A host’s debt is priced on the tenant behind the lease, so hosts are left out of the figures below.
2. How they operate
Inputs are GPUs, power and data halls. Revenue comes from a few large customers, contracted years ahead and often partly prepaid:
CoreWeave. Backlog ~$104B at 30 June, plus >$25B signed in the weeks after. Its three largest customers were 36%, 26% and 10% of June-quarter revenue; a year earlier one customer was 71%.
Nebius. $6.0B of deferred revenue (customer prepayments).
IREN. ~$4B of contracted annual revenue, ~$1B already running.
Adjusted EBITDA leaves out depreciation, which is large because GPUs are written off over a few years. June-quarter margins:
CoreWeave. Adjusted EBITDA 59%. Operating loss $49M, near break-even. The $626M net loss comes from $640M of net interest, a quarter of revenue.
Nebius. Adjusted EBITDA 40.6%. Operating loss $175.9M, 30% of revenue, before any interest. Net loss $190.4M.
IREN. Adjusted EBITDA $19.2M, 14% of revenue. Net loss $684.0M on $137.2M of revenue, including $450.4M of impairments, mostly on retired bitcoin-mining hardware, and a $102.1M write-down of assets held for sale.
Margins as a share of revenue, quarter to 30 June 2026 (IREN’s fiscal Q4). Adjusted EBITDA is each company’s own non-GAAP measure; Nebius’s is our calculation from its reported $236.2M. IREN’s operating and net bars run off the scale and are shown broken. *Firmus is private and its draft prospectus was not published: the hatched bar is the ~62% adjusted EBITDA margin the draft forecast for 2027 at its two operating sites, as reported by The Australian.
3. How they are financed
Five sources, used in very different mixes:
Convertibles. Nebius: $3.45B at 0.50% due 2030 and $2.30B at 4.50% due 2034, issued August. CoreWeave: $3.7B at 2.875% due 2033, priced 18 September.
High-yield notes. CoreWeave: four dollar issues at 9.00–9.75%, $7.75B in total, plus €2B at 8.50% due 2032.
Secured loans. CoreWeave’s delayed-draw loans sit in bankruptcy-remote subsidiaries that hold the GPUs and the related customer contracts, secured by $20.8B of assets at 30 June. Its latest, SOFR + 5.50% on $2.6B, was issued at 96–97 cents. Nebius: SOFR + 2.50% on $775M.
Contract-linked GPU financing. IREN: 6.0% on $3.6B tied to its Microsoft contract; 9.0% on a $2.4B Blue Owl/PIMCO facility for customers below investment grade. Same borrower, 300bp apart.
Prepayments. Nebius’s $6.0B of deferred revenue is customer cash.
Firmus has a US$10B Blackstone/Coatue facility (February 2026) and has not disclosed its pricing.
Coupons on disclosed financings up to 18 September 2026; market yield as of 14 October. A convertible’s coupon is low because the buyer also gets an option on the stock, which the chart does not price. IREN’s 6.0% is a weighted average excluding fees. Floating-rate loans not plotted.
4. Risk: is a 60% default price warranted?
A neocloud rents out GPUs, so each GPU has to earn back its own cost before it wears out, plus the interest on the money borrowed to buy it. A company stays above water when its EBITDA covers depreciation plus interest. Assume rental prices hold, so margins and depreciation schedules stay as they are, and price new money at what each company pays now.
CoreWeave
Nebius
IREN (AI cloud)
Assets counted
books + rest of 2026 plan
books + H2 spend
books + $13.8B committed
Margin used
57% (H1 adj EBITDA)
37% (H1 adj EBITDA)
87% (segment gross margin)
New money costs
15% (its own bond yield)
2.1–4.8% (Aug converts)
6.0–9.0% (its GPU financings)
Depreciation, per year
~$9.8B
~$3.6B
~$2.3B
Interest, per year
$6.3–8.0B
$0.3–0.8B
$0.9–1.4B
Revenue needed
$28–31B
$10.5–11.8B
$3.8–4.3B
June-quarter run rate
$10.3B
$2.3B
$0.28B
Multiple needed
2.7–3.0x
4.5–5.1x
13–15x
Growth a year to end-2028
50–56%
83–91%
183–196%
Latest growth
+112% y/y
+454% y/y
+110% q/q
Contracted or guided
$104B backlog
$7–9B ARR by end-2026
$4B ARR by end-2026
CoreWeave needs the least growth of the three. Interest is 39–45% of its yearly depreciation plus interest, so every move in its bond yield changes the revenue it needs. Nebius and IREN built further ahead of revenue and need more growth, but interest is 8–19% of that cost at Nebius and 29–37% at IREN; the rest is depreciation. IREN’s $4B contracted run rate falls inside the $3.8–4.3B of revenue it needs, on a segment margin that leaves out corporate costs. Nebius’s $7–9B guidance reaches the revenue it needs only at the top of the range, and only on its AI cloud segment margin of 50%.
The 60% default price on CoreWeave is a bet that its growth falls below about 50% a year before the new capacity pays for itself, at a cost of money that its own bonds set.
Beyond the three:
Core Scientific. 77% of first-half revenue from CoreWeave. Its exposure is to CoreWeave’s credit directly.
Firmus. Projected ~US$30B of debt once built, now to be raised privately.
5. Moving forward
Firmus shows how far neocloud financing had stretched. Its offer at A$11 valued the company at A$43.7B (US$30.6B), 2.9 times its US$10.5B private round two months earlier and about 600 times trailing revenue of US$50.8M. On the day it withdrew, IREN traded at about 25 times annualised June-quarter revenue, so Firmus was asking public investors for 24 times IREN’s multiple. The draft prospectus, as reported, projected about US$30B of debt once its sites are built, on top of a US$10B Blackstone/Coatue facility whose pricing it has not disclosed. The offer sought about A$7.1B of new money at a fixed price, with about half allocated to existing holders and about 42% of shares locked up (Forbes Australia). Its partnership with CDC on the 1.6GW Project Southgate had already ended after about 42MW (Data Center Dynamics). Firmus withdrew the listing on 9 October and said it will raise private capital.
September-quarter results are due in November, and each company has one figure to set against the stress test. For CoreWeave, revenue growth against the roughly 50% a year it needs. For Nebius, whether year-end annualised revenue is tracking the top of its $7–9B range, where its bar sits. For IREN, how much of the $4B contracted run rate is operating by 31 December.
Appendix A: the numbers side by side
CoreWeave
Nebius
IREN
Firmus*
Revenue, June quarter
$2,575M
$582M
$137.2M
n/a (FY US$50.8M)
Adj EBITDA margin
59%
40.6%
14.0%
~62% (2027 fcst)
Net debt, 30 June
$29.5B
$0.5B
$1.7B
~US$30B projected
New debt costs
9.00–9.75%
0.50/4.50%
6.0/9.0%
not disclosed
Equity value
~$34B
~$45B
~$11B
US$30.6B asked
Equity / revenue
~3.3x
~19x
~19x
~600x
vs 2026 high
−55.5%
−42.3%
−60.2%
IPO withdrawn
Equity values and price changes at 16 October closes; equity values count all share classes. Equity / revenue uses June-quarter revenue × 4; Firmus reported no quarter, so its ratio uses the year to June. Margins are for the June quarter; the stress test uses CoreWeave’s first-half 57% and Nebius’s first-half 37%.
The default price. At 1,194.5bp, CoreWeave’s CDS implies about a 63% chance of default within five years; at end-June’s 547bp, about 37%. Our calculation, assuming holders recover 40% of face, the market convention for senior unsecured CDS.
Sources and method notes
Sources
CoreWeave: Q2 2026 release and outlook presentation (11 August 2026); 10-Q (12 August 2026): debt maturities ($4,413M rest of 2026, $6,184M 2027, $4,416M 2028), subsidiary structure and collateral ($18.2B non-current plus $2.6B current assets), covenant compliance, customer concentration (customers unnamed), undrawn availability. Debt is recourse $31,405M plus non-recourse $3,663M, excluding finance leases; net debt = $35,068M − $5,524M cash − $15M securities. Note terms from pricing releases; convertible priced 18 September 2026; delayed-draw loan at SOFR + 5.50% per company release (10 August), 96–97 cents per Bloomberg (30 July). Origin: S-1 (3 March 2025), formation as The Atlantic Crypto Corporation LLC; Ethereum mining ceased 30 September 2022.
Nebius: Q2 2026 6-K exhibits 99.1/99.2 (12 August). Net debt $8,545.7M − $8,042.1M. Convertibles: 6-Ks of 19 and 24 August. Facility release 17 July. Former name: 6-K exhibit 99.1 (5 September 2024).
IREN: FY2026 8-K exhibit 99.1 (27 August): Q4 revenue $137.2M (AI cloud $70.5M, mining $66.7M), adjusted EBITDA $19.2M, operating loss $620.4M, net loss $684.0M, impairments $450.4M, held-for-sale write-down $102.1M; “$4bn contracted ARR for 2026 capacity; $1bn operating ARR today”. Net debt $7,593.0M − $5,895.6M.
Core Scientific: Q2 2026 10-Q (28 July 2026); colocation revenue entirely from CoreWeave, ~77% of first-half revenue.
Cipher Digital (renamed from Cipher Mining Inc. in February 2026; ticker CIFR unchanged): business update, Form 8-K exhibit (3 November 2025): AWS 15-year base term, 300MW gross, ~$5.5B estimated contract value; Fluidstack 10-year lease, 244MW gross (168MW IT), ~$3.0B minimum contracted revenue, $1.4B Google backstop.
Firmus: company releases (8 September; August US$2B equity raise) and Maas Group ASX announcement (9 October). Revenue, margin forecast, projected debt, lock-ups and allocation are from press reports of the unpublished draft prospectus (Cyber Daily, The Australian via Stockhead, ABC, Forbes Australia). Project Southgate: Data Center Dynamics.
Market levels: MarketWatch, 14 October (BondCliQ; Dow Jones Market Data); Bloomberg News, 15 October 2026, “CoreWeave Credit Risk Hits Record as Default Odds Top 60% on Borrowing Plans” (1,194.5bp intraday, ICE Data Services). CDS levels come from two providers: end-June 547bp and 12 October 881bp from Dow Jones Market Data, 15 October 1,194.5bp from ICE Data Services. Provider levels differ.
Equity values: 16 October closes × shares outstanding, all classes. CoreWeave 551.5M (Class A 458.9M + Class B 92.7M, 10-Q cover, 31 July 2026). Nebius 271.9M (Class A 238.4M + Class B 33.5M, 30 June 2026; excludes 21.1M Class A shares under NVIDIA’s pre-funded warrants, ~$3.5B). IREN 394.1M (10-K cover, 14 August 2026). Price changes: exchange closes.
Default probability
Hazard rate = spread / (1 − R), with R = 40% assumed recovery, the market convention for senior unsecured CDS and not a CoreWeave-specific estimate. Five-year probability = 1 − exp(−5 × hazard), constant hazard. 881bp (12 October) gives ~52%. A lower recovery gives a lower implied probability for the same spread. CDS prices include a premium for carrying the risk, so they sit above default rates recorded at the same rating.
Break-even test, CoreWeave
Test: adjusted EBITDA ≥ depreciation + interest, an adjusted pre-tax break-even. Depreciation stands in for principal: for rented GPUs the debt is repaid as the asset wears out (the latest delayed-draw loan amortises monthly to 2031).
Asset base: gross PP&E $52,622M at 30 June, of which $11,918M construction in progress. Rest-of-2026 spending: $37B guidance midpoint less first-half gross PP&E growth ($52,622M − $33,941M = $18.7B) = ~$18.3B. Gross PP&E growth is a proxy for first-half capex.
Depreciation rate: Q2 depreciation on PP&E $1.4B × 4 / in-service gross PP&E $40.7B = 13.8% a year (~7-year blended life). Applied to $70.9B gives ~$9.8B a year. No impairment or shortened lives assumed.
Interest: existing $35.1B at 10.3% (Q3 guidance midpoint $900M × 4) = $3.6B, plus $18.3B new at 15% = $2.7B, giving $6.3B. All at 15%: $53.4B × 15% = $8.0B. Assumes all new spending is debt-funded and the construction in progress is already paid for.
Margin: first-half 2026 adjusted EBITDA $2,667M = 57% of revenue (company non-GAAP measure), held constant. Chosen over Q2’s 58.6% to be conservative; at 58.6% revenue needed is $27–30B and growth to end-2028 ~48–54%.
Growth: required revenue $28.2–31.2B / $10.3B = 2.74–3.03x; annualised from 30 June 2026 over 2.5 years (to end-2028) = 50–56%; over 1.5 years (to end-2027) = 96–109%. Q2 2025 revenue $1,212M to Q2 2026 $2,575M = +112%.
At CoreWeave’s last fixed-rate issue (9.75%) instead of 15%: interest ~$5.4B, revenue needed ~$26.6B (2.6x), growth to end-2028 ~46%.
Liquidity: through 2028, existing debt service (~$15.0B principal + ~$7.0B interest) against cash of $5.5B and June-run-rate EBITDA of $15.2B leaves ~$1.3B short with no new building, inside the $2.0B undrawn revolver.
Not modelled: taxes, working capital, lease payments, equity or convertible funding (which would lower the interest line), and the lag between spending and revenue (which would raise the growth needed).
Break-even test, Nebius
Asset base: gross PP&E $14,149.5M at 30 June, of which $7,836.4M not yet in use (including prepayments). Nebius has filed no 2026 capex guidance, so second-half spending is set equal to first-half cash capex of $8,130.3M, a proxy. Base $22.3B.
Depreciation rate: Q2 PP&E depreciation $253.8M × 4 / in-service gross $6,313M = 16.1% (servers on 5-year lives from 2026), giving ~$3.6B a year.
Interest: existing $8,499M carrying value at 1.9% (coupon basis) or 5.1% (including accretion). New money ($8.1B) at the August convertibles: blended coupon 2.1%; blended yield to maturity including accretion 4.8%. Neither prices the conversion option given to buyers, so both understate the full cost.
Margin: first-half 2026 group adjusted EBITDA $365.7M / revenue $981.3M = 37%. AI cloud segment Q2: $285.7M / $574.9M = 49.7%; at that margin revenue needed is $7.9–8.9B (3.4–3.8x).
Run rate: Q2 revenue $582.3M × 4 = $2.33B. Growth: Q2 2025 $105.1M to $582.3M = +454%. Guidance: year-end 2026 ARR of $7–9B. Customer prepayments would fund part of the spending and lower the interest line further.
Break-even test, IREN AI cloud
Asset base: gross PP&E $7,663.3M less mining hardware $597.0M, plus committed capex of $13,810.0M (10-K). Base $20.9B.
Depreciation rate: Q4 depreciation and amortisation $112.1M × 4 / in-service gross $4,006M = 11.2% blended. GPU hardware is on 5-year lives and the new spending is GPU-heavy, so this likely understates. At 20% on construction in progress and committed spending, depreciation is ~$3.9B and revenue needed $5.6–6.0B, 1.4–1.5 times the $4B contracted ARR.
Interest: existing $7,705.6M principal at 1.6% weighted = $0.13B. New money at 6.0% (Microsoft-linked GPU financing) or 9.0% (Blue Owl/PIMCO facility, 25 August 2026).
Margin: AI cloud segment Q4 FY26 revenue $70.5M less cost of revenue $9.2M = 87%. Segment profit excludes depreciation and corporate overhead, so this is the most generous margin of the three. Group adjusted EBITDA was 14% in Q4.
Run rate: AI cloud Q4 $70.5M × 4 = $0.28B. Growth: Q3 $33.6M to Q4 $70.5M = +110% quarter on quarter (the year-earlier AI cloud quarter was not disclosed). The $4B contracted ARR is targeted to be operational by 31 December 2026, on the company’s own utilisation and pricing assumptions; operating ARR was $1B at 27 August.
Other checks
CoreWeave interest against earnings: Q3 guidance of $860–940M interest against $200–260M adjusted operating income. Each 1pp on $35.1B of debt is ~$350M a year.
Structure: the delayed-draw loans sit in bankruptcy-remote subsidiaries holding the GPUs and customer contracts ($20.8B of collateral). The CDS references the parent, whose noteholders stand behind them.
CDS and bond levels are attributed press figures; everything else is from company filings and releases.